Automotive · AS9100D certified for aerospace · Peenya, Bengaluru
Heat treatment you can read back.
Sealed-quench carburising, carbonitriding and through hardening for gears, shafts and pins. Every charge runs on a logged cycle, and every lot leaves with its test report.
- Sealed quench furnaces
- SQF-1, 2, 3 · integral oil quench
- Load per charge
- 400 kg
- Tempering furnaces
- TFC-1, 2, 3
- Pre-heat430 ± 10 °C · 60 min min.
- Carburise900 ± 15 °C
- BoostCP 0.98 %
- DiffuseCP 0.63 %
- Harden825 ± 15 °C
- Quenchoil 110 ± 10 °C
- Temper170–190 °C · 90 min
STEP typical parameters from process inspection records. Times illustrative; actual cycle per part specification.
Certification
AS 9100D
- System
- Aerospace quality management
- Includes
- ISO 9001:2015
- Status
- Certified
- Pyrometry AMS 2750 Thermocouples calibrated to the aerospace pyrometry standard
- Release 12 checks Run on every lot before its test report is signed
- Quench to temper ≤ 4 h Logged per charge; a missed window holds the lot
- Industries Automotive and general engineering; AS9100D certified for aerospace
On the record
The record so far.
- Years since incorporation, 2010
- 16
- Customers
- 80+
- Part numbers with an approved process recipe
- 450+
Trusted by
- Customer logo
- Customer logo
- Customer logo
- Customer logo
- Customer logo
- Customer logo
- Customer logo
- Customer logo
- Customer logo
- Customer logo
Processes
Seven processes, named the way the shop floor names them.
Every job on the floor carries one of these codes, from the jigging instruction to the test report.
- CHTCarburising, hardening and tempering
- CNCarbonitriding
- THTThrough hardening and tempering
- TMPTempering
- SRStress relieving
- CCAAnnealing
- NPDDevelopment trials
Quality and plant
Hardened under control. Released on the record.
- Sealed quench furnaces: parts are hardened and oil quenched without leaving the atmosphere, then tempered in TFC-1, 2 or 3.
- Carbon potential held by oxygen probe, not by recipe alone.
- PFMEA and control plan per part, with jigging work instructions.
- Test report with microhardness case-depth traverse, HR15N surface hardness and microstructure.
Customer portal
Where is my lot? Log in instead of calling.
Lot status, signed test reports and delivery challans for your company. STEP approves each account.
- ReceivedMon 09:10
- ScheduledMon 11:40
- HardeningTue 06:05
- TemperingTue 14:30
- Inspection—
- Ready—
Request a quote
Quote from the drawing.
Material grade, hardness and case depth are enough to start. We reply with the cycle we propose and a price.